works

Lakefront Development Trail Bridge

A 200 ft FRP Trail Bridge and lake crossing to serve this development for generations

CATEGORY

Structural

CLIENT

Residential Development, VA

COMPLETED

January 9, 2024

Project Overview

To unify a scenic lakefront community with the surrounding trail network, Pearson Pilings designed, engineered, and installed a long-span FRP trail bridge with an integrated observation and fishing platform—offering residents a beautiful, maintenance-free connection to nature.

Project Objectives

  • Provide a durable and sustainable bridge solution that enhances resident access to miles of nature trails across a central lake.
  • Design a low-maintenance structure suitable for a remote, natural setting with limited ongoing upkeep.
  • Deliver a unique amenity that doubles as both a functional trail connector and a gathering space for reflection, recreation, and scenic views.

Final Result

The completed FRP bridge stands as a striking and enduring centerpiece of the development—seamlessly integrating infrastructure with the natural landscape while inviting residents to explore, connect, and enjoy the outdoors for decades to come.

No items found.